Banner Image
Top 50 BadgeTop 50 Badge
First Gen Corporation

Operations & Maintenance Engineer For Pooling  

First Gen Corporation

 

Posted 13 hours ago and deadline of application is on 10 Nov

Recruiter was hiring 12 hours ago

2026-11-12T06:49:04.414316+00:002027-11-10T16:00:00+00:00

Job Description

Construction

  • Review Standard Operating Procedures (SOPs) & Work Instructions (WIs)
  • Assist in monitoring and reporting construction progress (QA/QC) for familiarization
  • Witness Testing & Commissioning (T&C) Activities
  • Ensure punch list items during T&C are resolved prior to handover to the O&M Team

Operations and Maintenance

  • Monitor power generation, S.C.A.D.A alarms, and plant status
  • Perform Lockout / Tagout (L.O.T.O) isolations and manage Permit-To-Work to ensure safe site operations
  • Follow standard operating procedures during operations
  • Prepare and submit daily logs and shift reports
  • Perform predictive maintenance through thermal inspections and I-V Curve tracing
  • Perform troubleshooting and diagnosis of faults in modules, inverters and other electrical systems

Minimum Qualifications

  • Graduate of BS Electrical Engineering
  • Registered Electrical Engineer (REE)
  • New graduates and candidates with up to 2 years of work experience
  • Applicants residing in Brgy. Bilog-Bilog, Maugat, San Jose, Sala, Luyos, Altura Bata & Altura-South, Cale and Talaga are preferred
  • Knowledge in Solar PV, HV Switchgear, SCADA is an advantage

Jobs Summary

Job Level
Entry Level / Junior, Apprentice
Job Category
Architecture and Engineering
Educational Requirement
Bachelor's degree graduate
Office Address
Ugong
Industry
Utilities
Vacancy
4 openings
Website
https://www.firstgen.com.ph/

Feel secure when applying: look for the verified icon and always do your research on a company. Avoid and report situations when employers require payment or work without compensation as part of their application process.

About First Gen Corporation

OUR BUSINESS First Gen Corporation (First Gen) is a leading independent power producer in the Philippines that primarily utilizes clean and indigenous fuels such as natural gas, geothermal energy from steam, hydro-electric, wind, and solar power. The company has 3,489 MW of installed capacity in its portfolio, powering 21.4% of the country’s gross generation. First Gen is a natural gas pioneer and owns four out of the five natural gas-fired power plants in the country. These are the 1500-MW Sta. Rita and San Lorenzo plants, the 97-MW Avion and the 414-MW San Gabriel power plant. Avion will be the first power plant in the Philippines to run on aero-derivative gas turbines while the San Gabriel plant is expected to be the most efficient natural gas-fired plant in Southeast Asia. First Gen also has the largest portfolio of power plants that use clean, renewable and indigenous fuels. The plants are present in all three grids of the Philippines, and can serve the baseload, mid-merit and peaking market segments. “Going forward, we continue to keep our eye on remaining relevant, effective, pioneering, and smart about the choices we make in moving towards a decarbonized world… First Gen continues to care about the world we live in, and we will continue to dare to make positive contributions.” – President and Chief Operating Officer, Francis Giles B. Puno

People also applied to

  1. Home

Other Recommended Jobs

Apply jobs in

Job Categories:

Related to your search: